YOUR HANGAR

FOR 20 DAYS

present
When ordering a hangar
over 1000 м2
SET GATE
FOR A PRESENT
  • Affordable price
  • New equipment
  • High quality materials
  • Quick turnkey installation

LEAVE A REQUEST

and get a BUSSINESS OFFER for you needs for 30 minutes

CONTACT INFORMATION OF THE CUSTOMER

SPHERES OF APPLICATION

FRAMELESS HANGARS

scopes
warehouses and logistics complexes
scopes
sports complexes
scopes
vegetable store and granary
scopes
garages and production halls
scopes
exhibition and 
retail space
scopes
service stations and aircraft hangars

5 BENEFITS

IN FAVOR OF FRAMELESS HANGARS

Minimum construction time
 
The speed of construction of 1000 m2 takes only 2 weeks
 
 
The ability to change the area of ​​the building 
Unlimited possibilities to change the area by increasing the length of the building
Service life not less than 50 years
The structure is not subject to corrosion and deformation, during operation does not require capital expenditures for repair and maintenance

                Erection in hard to reach              places
For the transportation of installation equipment and materials do not require complex machines and mechanisms.
 High wind and snow load
 
Structural feature of the structure is resistant to wind gusts up to 200 km/h, as well as snow loads up to 400 kg per 1m2

MINIMUM 2X CUT DOWN

CONSTRUCTION COST

FRAMELESS ANGARS
IN COMPARISON WITH REINFORCED CONCRETE, FRAME-METAL AND BRICK STRUCTURES
SIGNIFICANTLY FAVORABLE
FOR COST
PLUSES
FRAMELESS HANGARS
  • +
    Acceptable price
  • +
    Speed of construction
  • +
    More usable space due to lack of columns and load-bearing walls.
  • +
    Quick approval of the draft and the project work
  • +
    Inexpensive ribbon foundation
MINUSES
BUILDINGS FROM OTHER MATERIALS
  • High price
  • Long construction period
  • Loss of usable area due to columns and load-bearing walls
  • Long-term coordination of project work and the need for expertize
  • Massive costly foundation

REALIZED

PROJECTS

project project project project project
Tengiz6800 m2
Customer: Tengiz
PROJECT: Design and construction of 7 storage units hangars for hardware and equipment.
June 2016
project project
STORAGE ANGARS (7 units)6800 m2
Customer: "Ersai Caspian Contractor LLP"
PROJECT: Design and construction of 7 storage units hangars for hardware and equipment.
June 2016
project project project project project project
NONCARRED ANGARS (3 units)2800 m2
Customer: KCOI LLP
PROJECT: Construction of 3 hangars at the production base of Kazakhstan Caspian Opshor Industries LLP.
July 2017.
project project project project project project project project project project project project project project project project project project
"Olimpus" gum800 m2
Customer: Aktau City Akimat
PROJECT: Within the framework of a public private partnership, the construction of a multi-functional gym Olimpus.
July 2017.
project project project project project project project
VEGETABLE STORE1600 m2
Customer: Aspan Storage LLP
PROJECT: construction of a vegetable store (insulated with polyurethane foam) on the territory of the Free Economic Zone "Seaport Aktau" of Mangystau Oblast.
November 2016

LEAVE A REQUEST

and get a BUSINESS OFFER for your needs for 30 minutes

CONTACT INFORMATION OF THE CUSTOMER